26/12/2023 The three rooms at the back of the barn.

02/05/2024 Demolition of the room with the plastic corrugated roof begins.

03/05/2024 Man at work.

Going going.....

02/05/2024 The room with the corrugated plastic roof view from the lounge window.

Room gone, and the corrugated metal on the wall removed and plastered. 03/06/24

07/05/2024

29/05/2024 the window moved from the demolished room to the new wall.

03/06/2024 note the water reservoir on the left is now covered properly with a locked top.

28/11/2024 Sun catching the roof and on starting to paint the doors green, it was discovered they were not in very good condition so painting was put on hold.

22/01/2025 New doors were added today waiting for painting.

23/01/2025 First coat of paint.

03/02/2025  The second coat of paint and beam across the top painted...

As above...

As above but a different view.

The new fence on the right.

03/02/2025  Doors are painted inside now as well.